Planning Board Minutes - August 11, 2003
Those present at the August 11, 2003 Planning Board meeting were:
Planning Board Members: Steve Watts - Chairman
Marcel Nadeau
Cindy Patenaude
Rich Berkowitz
Tom Ruchlicki
John Higgins
Secretary: Tara Anuszewski
Planner: Jeffrey Williams
Deputy Attorney: Lyn Murphy
CHA Representative: Mike Bianchino
Liaison: Walter Polak
Mr. Watts called the meeting to order at 7:00 pm
Mr. Higgins made a motion to approve the July 28, 2003 minutes. Mr.
Nadeau seconded. Motion carried.
Public Hearings:
03.178 Mike Abele Subdivision, Boyack Road, Major Subdivision. Mr.
Watts called the public hearing to order at 7:03 pm and asked if
anyone wanted the notice read. No one responded. Mr. Watts stated
there are a number of people who will like to speak and asked if they
could keep the comments brief but make sure they get what they want
in. Mr. Watts stated if someone has already made a point and it is a
valid point not to have the point repeated several times. Mr. Higgins
commented that the applicant is proceeding at his own risk because of
the lack of a water agreement. Mr. Tom Andress was present and stated
this project has been before the Board a number of times. It has been
through a public hearing for a 14-lot subdivision and are now back for
a 10-lot subdivision. Mr. Andress stated this design has allowed them
to create larger lots in the rear of the parcel. The rest of the lots
vary from a ½ of an acre to about ¾ of an acre. The frontage is all in
conformance with the Town requirements. They are proposing a storm
water management area at the lower end; it is the same as what was
proposed for the 14 lot. Mr. Andress stated they have not changed the
size of it; the capacity is for a 100-year storm plus extra capacity.
The water and sewer are still being proposed the same way they
originally had. All of the houses would be on grinder pumps and
low-pressure systems. Mr. Andress stated as Mr. Higgins mentioned
there was an article in the paper regarding the water. They have
spoken with Clifton Park Water and are working on a re approval for
all of the lots. Mr. Nadeau asked if there was a letter on file where
the applicant is proceeding at his own risk. Mr. Abele stated they
will but do not yet. Mr. Abele also stated he was reassured they
should not have any problems getting water by the Clifton Park Water
Authority. Mr. Watts asked if anyone from the public wished to speak.
Mr. Larry Sistack of 43 Riverview Road stated this part of Boyack Road
is under water with ice jams from the river. Mr. Sistack also stated
he has been there when there has been 3 – 4 feet of water over the
road and the fire department can not get in. Mr. Sistack stated he has
been trapped many times from the flooded river. Mr. Sistack stated the
Town should consider the cost of improving the road or denying the
subdivision. Ms. Barb Cramon stated she has lived in this area for 50
years. Raising the road created a more severe problem. Ms. Cramon
stated the water will have to go somewhere and it will. Ms. Cramon
stated Clifton Park wont let you build if you are going to be flooded
in. They don’t want situations where the emergency vehicles cant get
to you. Ms. Cramon stated she is afraid that is what they are going to
do. Ms. Cramon stated bringing in those extra families would be
detrimental to the overall environment of the area. Ms. Inge Parlo of
139 Boyack Road stated she couldn’t agree more with Ms. Cramon. Ms.
Parlo has lived there for 16 years and has seen a lot of flooding on
Boyack and Riverview Road. Ms. Parlo stated she has put together
pictures for the Board of some of the floods that have happened in
that area. Ms. Parlo explained what the pictures were to the Board.
Ms. Parlo stated many residents have had flooded basements in this
area. Ms. Parlo stated she is still concerned about how they can go
from 2 houses on these lots to 10. Ms. Parlo stated Mr. Abele was
before the Board originally for the four lots and stated it was not a
surprise to Mr. Abele that he could not develop more then the four
lots. Ms. Parlo stated Mr. Abele knew that was the deal before he
purchased the lots that he could not build more then four. Ms. Parlo
stated she is going back to that particular point and asked why are
they there. Ms. Parlo stated she does not see much that is different
then the 14-lot plan as far as storm water by the road, no fence by
the water for small children. Ms. Parlo stated doubling the tree line
does not have a significant impact on the noise of the Northway. Ms.
Parlo stated she was reading the comprehensive plan for the Crescent
area and this plan does not follow their plan for that part of Town.
Ms. Parlo stated she is not comfortable with this plan and would like
to see it back to the original plan. Mr. Ken Buniak of Southbury Road
has lived in this area for 16 years and agrees with Ms. Parlo. Mr.
Buniak stated in his 47 years of life he has learned you cannot
predict what water is going to do and especially when there is clay
involved. Mr. Buniak stated he had to spend $2,000.00 to get the water
away form his house because the road was improperly drained and
graded. Mr. Buniak stated he has seen traffic on Boyack Road and
Southbury Road escalate significantly and would not have children go
near those roads. Mr. Buniak stated Mr. Abele owns the property and
should be able to develop it but reasonably developed. Mr. Buniak
stated on a clear night the cars from the Northway sound like they are
going through their houses. Mr. Buniak stated if you take out any of
the buffer it would become useless. Mr. Buniak stated to the Board to
consider the ramifications of the people who live there before they
make their decision. Mr. Traver lives just south of this development
and stated the concerns people have from the ice jams does not have
any impact on the project. Mr. Traver stated he has not seen any
flooding in the Halfmoon area since he has lived there it has only
been on the Clifton Park side. Mr. Traver stated he does not see any
adverse effects of this development. Mr. Art McCall of 128 Old Coach
Road remembers the flooding of 90 and stated someone from the Town
must have done something because he has not seen it flood in the last
couple of years. Mr. McCall is in favor of this. Mr. Danny Johnson of
91 Algonquin Road abuts Ms. Parlo’s property and has been there for 18
years. Mr. Johnson stated since he has been there he does not recall a
time when the road was not impassible. Two years after Mr. Johnson
bought his property he had to install a two-foot retaining wall. Mr.
Johnson stated he was the Chairman for the Clifton Park Economic
Development Committee for four years and is pro development. Mr.
Johnson stated he is not an Engineer but with what he has had to deal
with in his back yard it has given him an education with the
difficulty of controlling it. Mr. Chris Brownell of 3 Montgomery Way
lived in this area before Old Coach Way was developed and all of the
vegetation was stripped off. They had a subsequent amount of flooding.
Mr. Brownell stated if they are going to strip off all of the
underbrush and vegetation he expects to see the same kind of problems.
Mr. Brownell started he also does not remember a year that it has not
flooded. A resident of 6 Mohawk Trail spoke and stated with the new
development that has happened in this area they have already lost a
lot of trees and feels they will have some impact from this
development as well. The resident also noted she has see Boyack Road
every year be impassible from the water. Mr. Stafford Evans of 67
Algonquin Road stated all of the comments from the public have been
valid and said to the Board to please not approve this subdivision out
of obligation. Mr. Stafford does not want the Board to approve this
just because they have already asked the applicant to go back and
reduce it. Mr. Stafford does not feel houses are good there for many
reasons and wants the Board to judge in their best judgment. Mr. Jim
DeLorenzo of 79 Algonquin Road stated he does not want to be redundant
but is concerned with the environment, steep hillside, adjacency of
wetlands, flooding issues and the proximity of the Northway. Mr.
DeLorenzo stated when the four lots were approved there was a
recognition of these issues and there continues to be a recognition of
these issues. Mr. DeLorenzo stated there was a commitment at that time
for no further subdivision of that land with the recognition of those
issues. Mr. DeLorenzo stated because the developers issues are
monetary in nature, he is concerned that the issues will be down
played. Mr. DeLorenzo wants the Board to continue to recognize and put
these issues at the forefront. Ms. Diane Sidell of Kimberly Court
borders the wetland and is concerned about increasing the water in her
back yard and the noise. Mr. Watts asked if anyone else wished to
speak. No one responded. Mr. Watts closed the public hearing at 7:33
pm and asked if anyone from the Board had any comments or questions.
Mr. Nadeau asked Mr. Andress to explain the buffering against the
Northway. Mr. Andress stated they had a smaller no cut buffer but have
increased the buffer. Mr. Nadeau asked what was there now. Mr. Andress
responded trees. Mr. Berkowitz asked where they start. Mr. Andress
showed the Board the tree line on the map. Mr. Andress stated they are
proposing all of the frontage along the Northway to become single lot
all the rest of the lots wont have any frontage on the Northway. Mr.
Andress stated they would have a restrictive 70-foot buffer. Mr.
Andress stated it gives the homeowner the option where to place their
house. Mrs. Patenaude stated one of the comments made was it was
clay/soil and she thought it was listed as sandy and well drained over
90% of the site. Mr. Andress stated the upper area is sandy and the
lower area by the detention basin is clay/soil. Mr. Andress stated
there are variations in the area. Mrs. Patenaude asked in this case
what is predominant. Mr. Andress responded the lower area is
predominantly clay/soil. Mr. Nadeau asked if the clay area was in the
detention area. Mr. Andress stated the detention area is in the clay
area and it is what DEC is requiring they do not want detention basins
to be sand. Mr. Berkowitz asked how far off of the road is the
drainage ditch. Mr. Andress stated the retention pond is about 100
feet off of the property line and about 35 feet off the pavement edge.
Mr. Berkowitz asked how often this floods and how deep is the basin.
Mr. Andress responded there are two culverts and if there were any
flooding it would be just along the edge of the roadway. Mr. Andress
stated the property goes up a significant grade off of the road. Mr.
Berkowitz stated the water would be coming down into the already
flooded area. Mr. Andress stated he does not have any knowledge of any
flooding that has ever occurred there. The culverts are clear. Mr.
Berkowitz stated they have just heard about flooding that has happened
every year.
Mr. Andress stated he does not believe it was the statement he
believes there was flooding on Boyack Road but does not believe it is
in this location and believes it is from ice jamming. Mr. Berkowitz
stated it is from ice jams, rain and snow. Mr. Andress stated there
hasn’t been any major ice jams recently. A resident felt he was being
called a liar and Mr. Watts stated no one is calling anyone a liar
there are differences of opinions. A resident suggested the Board
contact the Crescent and Clifton Park Fire Departments that actually
goes and tries to evacuate the residents on Riverview. Mr. Watts
stated he recognizes there are flooding issues in that area in the
spring from ice jams. A resident stated the ice jams are a relatively
small part of the problem maybe 1%. Mr. Watts stated that is not how
it was portrayed. Mr. Berkowitz asked if anyone has done studies to
see if the water was coming from streams, the river or ice jams. Mr.
Andress stated he has not done a study on flooding. Mr. Nadeau stated
in reality he believes it comes from all of them. Mr. Berkowitz stated
it would be a good idea to find out when it is happening and where it
is coming from. Mr. Watts agreed. Mr. Abele stated he has owned the
property for three years and a couple years ago they put in a culvert.
There have been several storms including the one over the past weekend
and it did not flood. Mr. Abele stated New York State is allowed to
use a wrecking ball to break up the ice jams. Mr. Abele also stated
this past winter it did not flood. Mr. Abele stated with this new
proposal they have increased the buffer zones and created a
conservation easement. Mr. Abele stated he does not see where anything
would cause a problem. Mr. Watts asked Mrs. Patenaude if she had any
concerns. Mrs. Patenaude stated her only concern was with the clay
slope and would be encouraged if the area did not flood after the
storms we have recently had. Mrs. Patenaude feels the Board should
take some time and review some of the data. Mr. Nadeau stated he has
concerns about the buffering of the Northway being a no cut area. Mr.
Nadeau stated there have been properties in Town with no cut buffers
and they have been cut down. Mr. Nadeau stated that when the property
owner takes possession of the land sometimes the no cut buffers are
not followed. Mr. Abele stated the reason the parcel is designed the
way it was is because he is going to retain that parcel. The reason
they designed the large lot was so that the Northway buffer was
completely part of that parcel. Mr. Abele stated that he has tried to
address the road, buffer and density issues that were previously
raised with prior applications. Mr. Watts asked Mr. Abele where they
are proposing to place the house. Mr. Abele showed them on the map.
Mrs. Jan DeLorenzo commented there are streams in the back and along
side the property Mr. Abele is developing and she has concerns with
the impacts of the stream. Mrs. DeLorenzo continued that her neighbors
have sump pumps because of the water problems in the area and that the
stream floods in the spring and affects Mrs. DeLorenzo’s property. Mr.
Watts asked the Board if they had any questions. Mr. Ruchlicki
questioned the location of the detention basin and the proximity to
the road. Mr. Ruchlicki would like to see the detention basin moved
off of the road and a landscaped buffer between the road and the
detention basin. Mr. Ruchlicki would also like CHA to review the
flooding problems and the ice jamming on the river. Mr. Watts asked
Mr. Bianchino if he could review the flooding concerns during their
review. Mr. Watts asked Mr. Higgins if he had any concerns. Mr.
Higgins responded that he has seen the area flooding in the past. Mr.
Higgins wanted to know if Boyack Road flooded would the residents in
the proposed subdivision be able to get out or would they be isolated.
Mr. Abele stated the road typically floods above the proposed
subdivision and that the residents would not be isolated. Mr. Higgins
questioned if the road was raised would it help the flooding
situation. Mr. Higgins stated that he has concerns with the detention
basin with regards to the location near the road. Mr. Berkowitz stated
he agrees with Mr. Ruchlicki’s and Mr. Higgins’s concerns with the
storm water detention area. Mrs. Patenaude stated she would like to
see the detention basin moved from the road and would like the
engineering review the steep slopes associated with the project.
Someone from the audience spoke up whereas, Mr. Watts stated they
would not take public comment at this point and asked to have the
concerns be forwarded in writing to the Planning Department. The
person asked if she could ask one question whereas Mr. Watts allowed
the question to move forward. The person asked if there is an
independent engineering firm reviewing the project. Mr. Watts stated
Clough Harbour and Associates are the Town’s engineers and do an
independent review on the Towns behalf. Mr. Nadeau stated it was his
opinion that he would like to entertain the 4-lot subdivision that is
the present situation. Mr. Watts asked CHA to review the proposed
subdivision. This item was tabled.
03.182 Prospect Meadows, Summerfield Circle, Lot Line Adjustment. Mr.
Watts called the public hearing to order at 7:55 pm and asked if
anyone wanted the notice read. No one responded. Mr. Duane Rabideau of
VanGuilder and Associates presented the subdivision proposal. Mr.
Rabideau stated that the Prospect Meadows was previously approved and
the developer reviewed the approved subdivision layout and in order to
make the lots more developable would like to adjust the lot lines to
five lots. Mr. Rabideau continued that the lot line adjustments will
create larger lots for four lots and one lot will be omitted. Mr.
Watts asked if anyone from the public would like to speak. No one
responded. Mr. Watts closed the Public Hearing at 7:56 pm.
Mr. Nadeau made a motion to approve the lot line adjustment as
presented. Mr. Berkowitz seconded. Motion carried.
03.183 Romano Subdivision, 1475 Route 9, Minor Subdivision. Mr. Watts
called the public hearing to order at 7:58 pm and asked if anyone
wanted the notice read. No one responded. Mr. Rabideau presented the
minor subdivision proposal. Mr. Rabideau stated that the proposed
subdivision is to create a lot from lot B. The new parcel will
separate two existing wood frame buildings from the Rome Plaza parcel.
Mr. Rabideau continued that the new lot would utilized the existing
ingress/egress through an easement and also have established an
easement in the back part of the new lot for shared access for Rome
Plaza and Rome Restaurant. Mr. Watts asked if anyone from the public
would like to speak. No one responded. Mr. Watts closed the Public
Hearing at 8:01 pm. Mr. Watts asked the Board if they had any
questions. Mr. Nadeau asked what the frontage on Rt. 9 for each lot.
Mr. Rabideau stated Lot C (proposed lot) would be 40 feet; Lot B is
approximately 260 feet. Mr. Chauvin asked what about Lot A. Mr.
Rabideau stated Lot A is the Rome restaurant which is on its own lot.
Mr. Chauvin stated that it was part of the original parcel and would
like to know the frontage. Mr. Rabideau stated it is approximately 200
feet. (There is a large inaudible portion on the tape where it appears
that Mr. Nadeau and Mr. Bianchino are discussing the frontage) Mr.
Watts asked about the easements. Mr. Rabideau stated they are proposed
easements so that all parcels can utilize the existing curb cut. Mr.
Nadeau stated that himself and Mr. Chauvin thought that there might be
some past issues with subdividing the Lands of Romano and that may
need to be researched further. Mr. Nadeau also stated there are a
couple of used cars for sale near Rt. 9, which are not allowed. Mr.
Higgins asked if the subdivision was approved and the applicant wanted
to remove the existing wood frame buildings would the “approval” of
the proposed subdivision supercedes the site plan review. Mr. Chauvin
stated that the applicant would need to gain site plan approval and
the site plan would have to conform to the site specifics according to
the zoning ordinance. Mr. Nadeau stated he would like to have the past
Planning Board issues with these parcels. Mr. Watts stated the item
would be tabled for review of past issues.
Old Business:
02.118 Rolling Hills PDD, Cary Road, PDD – Major Subdivision – GEIS.
Mr. Percy Cotton presented the proposed major subdivision. Mr. Cotton
stated they have prepared more detailed plans, which CHA has reviewed.
Mr. Cotton continued that Phase I will consist of 57 single-family
lots. Phase I will place sewer lines to be pumped to a location and
gravity fed to the Sysco line. The water line will be extended up to
the intersection of Rolling Hills Drive and continuing to the
intersection of Tabor Road and Johnson Road, which will provide water
to the existing residents along the route. The storm water will be
collected in two different locations in Phase I. The detention ponds
have been designed to handle the two, ten, and twenty-five year storm
event and to pass the 100-year storm. Mr. Cotton stated he met with
the committee at the site and a question of how the detention basins
will look like came up. Mr. Cotton presented cross sections of the
detention basins. Mr. Cotton showed the line of sight from a car and
that you would not be able to see the top of the detention basin from
Tabor Road. Mr. Cotton continued that the Cary Road line of sight is
different because Cary Road is at a higher elevation than the existing
ground as compared to Tabor Road. A passing car from Cary Road would
be able to see approximately 2-3 feet into the detention basin. The
existing vegetation will be preserved to help with the site. The
maximum height of the water would be about 2 feet from the top of the
basin for a 100-year storm. Mr. Ruchlicki stated he has concerns with
the detention basins in respect to the proximity of the detention
basin and the property line. Mr. Ruchlicki would like to see the basin
shifted toward the utility easement. Mr. Cotton suggested he could
reconfigure it to make the basin wider but stated the water must go
through the culvert under the road. Mrs. Patenaude asked what is the
depth of the detention basins. Mr. Cotton stated both detention basins
are 6 feet deep. Mr. Higgins stated they discussed buffering of the
detention basins and would like to see that on future plans. Mr.
Higgins stated that the extension of the water line along Cary Road
has a number of residents on shallow wells and cisterns and would like
to have the water line put in at the earliest stage as possible. Mr.
Cotton stated that was agreed. Mr. Watts stated with regards to the
buffering on the detention basins that the Highway Superintendent
agrees to the layout because of maintenance issues. Mr. Cotton stated
that there would be access to the detention basins from the interior
roads of the development. Mr. Ruchlicki stated he noticed there was a
future parking for the trail system on the plans. Mr. Cotton stated
yes that it would be placed in a future phase and not phase I. Mrs.
Patenaude asked if the parking area could be located in another area
because she is concerned with the impact of the visual from the road,
impact to existing residents and the impact to the wetlands. Mrs.
Patenaude would like to see the parking area moved or screened better
to lessen the visual impact. Mr. Berkowitz suggested of possibly
locating the parking area near the industrial development portion of
the PDD. Mrs. Patenaude continued that she has concerns with the
overall impacts to the areas wetlands and would like to see an exact
figure on how much wetlands are proposed to be impacted. Mr. Cotton
stated that a total area of jurisdictional wetland to be impacted is
about 0.48-acres. Mrs. Patenaude asked with the Leibech Lane extension
that would be an acre. Mr. Cotton stated yes but continued that they
are reviewing the layout of the other Phases to lessen the future
impacts to the wetlands. Mrs. Patenaude stated that some of the
building footprints in other phases look like they are being built
very close to wetlands. She would like the applicant to review the
house placements with regards to lessening impacts to the wetlands.
Mr. Cotton stated some of the wetlands identified on the plans are
isolated wetlands and are not under the jurisdiction of the State of
Federal wetlands. Mr. Cotton stated there are no State wetlands within
the project. Mr. Berkowitz asked what the timing is when Leibech Lane
will be connected to Tabor Road. Mr. Cotton stated he understood that
would occur sometime after Phase II and before the completion of Phase
III. Mr. Nadeau stated that this project came in years ago and that it
has always been a very strong concern of the Planning Board to get the
connection to Rt 9 as a first priority. Mr. Nadeau stated that no one
would utilize the connection as presented. Mr. Nadeau stated it needs
to be done before Phase II. Mr. Higgins asked if the connection would
be done before CO’s are issued in Phase II. Mr. Nadeau asked Mr.
Chauvin if the PDD legislation would need to be revised. Mr. Chauvin
stated no that the existing PDD legislation provides the sequence of
when the Leibech Lane extension will occur but it is Mr. Chauvin’s
understanding that the applicant will commit to a timing sequence that
is agreeable to the Planning Board and will be a condition of the
final approval. The only caveat that Mr. Chauvin would like is that
there is some flexibility to allow the Town to obtain the proper ROW
to best align the extended road. Mr. Chauvin continued that with the
road dedication process that all infrastructures will need to be in
place before dedication and that no CO’s are issued until the road is
dedicated. Mr. Watts asked Mr. Williams what stage in the planning
process is this application. Mr. Williams stated the Town Board has
created the PDD legislation and the application is in front of the
Planning Board to gain preliminary approval for Phase I of the project
in order to approach the other agencies for their comment and review.
Mrs. Patenaude would like to get some of the additional information
asked tonight from the Board. Mr. Nadeau agreed. Mr. Watts asked what
information. Mrs. Patenaude asked wetland impact information and Mr.
Ruchlicki’s concerns with the stormwater. Mr. Watts suggested that the
applicant work with the committee and the other members of the Board
to pass along their comments to the committee. This item was tabled to
further review with the committee review team.
Mr. Stiles stated that he would like to approach the Board. Mr. Watts
stated that he would need to give the information to the committee.
Mr. Stiles stated that the project is adjacent to his property. Mr.
Stiles stated his drinking pond was inundated by a storm with runoff
from the lands of Valente. Mr. Stiles handed pictures of the situation
to the Board.
02.218 Sheldon Hills PDD, Route 146, PDD – Major Subdivision – GEIS.
Mr. Gordon Nicholson from EDP presented the application to the Board.
Mr. Nicholson stated they last appeared in front of the Board in June
with a presentation of 323 units including the elimination of the
condominiums. The applicant stated that they have had previous
meetings where alternative density and alternative land use mix
scenarios have been discussed. Since the June meeting it is the
understanding of the applicant that there is some interest in the
original land use mix with some condominiums and additional density
based on the potential for traffic impact mitigation monies born by
the developer. Mr. Nicholson stated that they are in front of the
Board for consideration of 398 units of which 112 will be
condominiums. Mr. Nicholson stated the condos will be in the same area
of the original plan but have eliminated 40 condos from the original
proposal of 152 by doing so has increased the green space. The
developer has also committed to give the Town approximate $2,890 per
unit for all of the units outside of the GEIS territory. The developer
is also willing to go with the 323 units with the elimination of the
condo units but would like to receive direction from the Board on how
to proceed so that the SEQR process can be completed and the
application moving forward. Mr. Watts stated that there have been
discussions with the Town Board, Planning Board and the Town Attorneys
with the idea of reinstating the condominiums back into the plan and
the mitigation fees that would be paid. Mr. Watts continued that the
Town is in a phase of rapid development that will continue. There is a
serious situation with the State budget that impacts the ability for
funding of things such as road improvements. One of the major concerns
of the Planning Board is the traffic congestion at the intersection of
Rt. 236 and Guideboard Road. The discussion of the possibility of
reinstating the condos, which is less dense than the original
proposal, and that any money derived from the units outside of the
GEIS would go directly to the improvements needed at the Guideboard/Rt
236 intersection. This could be a way to alleviate a heavily congested
area in which the residents face daily. This also recognizes that the
traffic problems within the Town are not only created by development
with the Town but from other surrounding communities as they develop.
Mr. Watts continued stated that there are a lot of traffic problems
out there that cannot be controlled by stopping development in the
Town. With all of that in mind, this could be a way to improve a
much-needed area. Mr. Polak stated that the Town has acquired property
on Guideboard when the time came for the improvements. This added land
would be utilized to create the needed turning lanes. Mr. Polak
continued that the Town asked for funding and was turned down by the
State. Mr. Nicholson stated that with the density and land use mix
presented before the Board there would be approximately $900,000
dollars derived for the traffic improvements to the area. Mr. Watts
asked if the Planning Board had any comment. Mr. Higgins stated only a
percentage of the mitigation fees was going to the Guideboard Road
improvements and the other fees in the GEIS would go the improvements
identified in the GEIS. Mr. Chauvin stated that Mr. Nicholson has
calculated fees within the GEIS and outside of the GEIS. The units
outside of the GEIS would be 311 units, which the mitigation fees
would go to the Guideboard/236 improvements. The balance of the units
is in the GEIS and the mitigation fees would go to the GEIS
improvements. Mr. Chauvin stated that no money is being taken away
from the GEIS. Mr. Berkowitz asked if the proposed agreement would
affect the improvements on Rt. 146. Mr. Nicholson stated no that the
required improvements to Rt 146 will be part of the development of the
property. Mrs. Patenaude stated she understands that there are needed
improvements with Guideboard Road and that is important. She continued
that she is concerned with going back to the original plans that
Saratoga County had a dilemma with or close to the original plan. Mrs.
Patenaude stated she has an issue with the condos being clustered near
the secondary entrance on Upper Newtown Road and not near the main
entrance where there is a proposed light for traffic control on Rt.
146. Mrs. Patenaude stated the Guideboard/236 intersection is needed
but does not know if there is any other way to come up with the money
for the improvements. Mrs. Patenaude does not want to feel like they
are creating on problem to solve another problem. She continued that
there is major development in the North such as the Chip Plant where
traffic will going both ways and wants to look at the scenario in
long-range terms. Mrs. Patenaude stated she has an issue of expanding
the density simply for the sake of getting money for Guideboard and
asked if there was another way of accomplishing it. She is worried of
setting a precedent on increasing the density for the increase of
money. Mr. Polak stated that it is a golden opportunity to correct a
problem the Town has been trying to do so for 16 years. Mr. Nadeau
stated he has a concern with the condos. The Board has previously
stated they did not want the condos. Mr. Nadeau stated that he
understands there are areas with this proposal that are outside of the
GEIS but the general consensus of the public through survey has stated
they want single-family units. Mr. Nadeau stated he agreed with Mrs.
Patenaude on that it may create more of a problem and that there are
other areas in the Town with traffic problems. Mr. Higgins stated he
agreed that the location of the condos should be near the traffic
lighted intersection. Mr. Higgins asked if the Town had any estimates
on the cost needed for the improvements. Mr. Polak stated there is not
an updated cost but the last one was about a million dollars. Mr.
Watts stated the Town does have existing funds for traffic
improvements and hopefully the Town would be close to do the
improvements. Mr. Nadeau stated the hopeful part is the problem. It
does not appear to be able to be done right away. Mr. Watts stated the
attempt was to come up with a way to fix an occurring problem that has
been identified by the Planning Board on numerous occasions. Mr.
Nadeau stated he understood but is concerned. Mr. Berkowitz asked how
soon would the traffic improvements occur. Mr. Berkowitz would not
feel comfortable on voting on anything unless there was some sort of
traffic improvement timetable. Mr. Polak stated the Town would need
all of the money, have drawings in hand to be reviewed by the County
and State and that would be a long process. Mr. Berkowitz asked when
the funds would be forwarded to the Town. Mr. Abele stated the fees
would be paid to the Town upon the issuance of each CO. The project
would be phased and it is too early to determine when full build out
would occur. Mr. Abele stated they are willing to go either way with
or without the condos. The issues are very complicated; there is a
learning curve. The applicant stated they would work with the Planning
Board and cooperate with the Town in what direction they feel is best.
Mr. Nadeau stated that in his opinion he likes the proposal with no
condos. Mr. Ruchlicki asked if the monies could be forwarded before
the completion of the project. Mr. Abele stated the mitigation fee
would be paid as each CO issuance. Mr. Abele stated that he
improvements on Rt 146 will cost $250,000 and there are improvements
with the Towns water system. The project must be economically viable
to the developer in order to continue, so monies up front would create
too much of an economic burden to move forward. Mr. Nicholson asked to
discuss the revisions with CHA and further discuss the issue at the
next Planning Board meeting. Mr. Watts stated he would let the
applicant know how to proceed with the application in the near future.
This item was tabled.
03.147 Parkford Square, 449 Route 146, Commercial Site Plan. Mr.
Gordon Nicholson presented the project and stated the last time this
application appeared in front of the board was in early June. The
applicant has a traffic study, performed by Creighton Manning, in
response to CHA comment letter. There was initial concern from the
Board about a curb cut on Rt. 146 whereas the traffic study shows the
sight distance is acceptable and the stopping distance is acceptable
but the traffic study has suggested that some vegetation be removed to
improve the conditions. The traffic study suggests that the Rt. 146
curb cut be one lane in and one lane out. The applicant has contacted
the Saratoga Sewer District and there is acceptable capacity and there
is no problem with the connection to the force main on Route 146. The
density has been reduced by approximately 800 to 1,000 square feet.
Saratoga County and CHA have suggested the site have two front yard
setbacks, which are illustrated on the plans. On the plan are also
some subsurface stormwater management locations. They are asking the
Planning Board to set up a committee and refer this to CHA along with
the traffic study. Mr. Watts asked if anyone from the Board had any
questions. Mr. Higgins asked about the road going around the
perimeter, it was discussed one time, if it was required for access to
the dumpster area or traffic. Mr. Nicholson responded they are looking
at it as a service alley. They have prepared the traffic study to be
set up for Office Space and Retail. Mr. Nicholson stated it was
important to get service behind the building. Mr. Higgins asked about
the properties in the rear. Mr. Higgins stated some are Commercially
Zoned but are residentially used. Mr. Nicholson stated there is the
Auto Auction and some residents that border the site and some vacant
land. A resident stated there is no vacant land it is all residential.
Mr. Berkowitz asked what the distance between the resident’s property
line and this property line. Mr. Nicholson responded approximately 20
feet. Mr. Nicholson stated there is a cluster of vegetation they will
be preserving at the rear of the site. They started out with the
service lane around the building because it is normal practice for
retail space. Mr. Higgins stated the Board has historically looked at
a 50 foot no cut buffer by residential zones. Mr. Higgins stated that
could be part of the committee discussion. Mr. Watts read a letter
submitted by some residents with concerns. (Attachment #1). Mr.
Roberts and Mr. Berkowitz will serve as the committee. This item was
referred to CHA and tabled.
03.166 County Waste, 1927 Route 9, Addition to Site Plan – PDD. Mr.
Tom Andress was present and stated they are proposing to redo the
entire site and take an outside sorting operation and bring it inside.
They are also proposing to upgrade the existing buildings into more
efficient space. They are also putting in more parking spaces for cars
and trucks and more gravel areas for roll off trucks. They will now be
connecting to the Saratoga County Sewer and creating a large retention
basin. They are also building a private water system because of the
distance to public water for their fire protection. Mr. Andress stated
that is their proposal. Mr. Andress stated there has been a change
since the last time they were before the Board. Mr. Andress stated the
buildings are in a slightly different configuration. There was another
building that was proposed for the maintenance with a 10-foot strip in
between but it made more sense to make it a single building and
adjusted the square footage as needed. Mr. Andress stated they have
modified a couple of the storage areas. Mr. Andress stated they have
responded back to CHA’s comments about the backup beepers and stated
they will come up with a solution, possibly a temporary shut off of
the beepers. Mr. Watts would like an answer for that comment. Mr.
Nadeau asked if anyone recalled any comment made or the wording
stating at the time of the original approval that this approval would
only stay with this applicant and if the operation was sold all
approvals attached to this site will be void. Mr. Higgins stated it
would require the next applicant to come before the board for an
approval. Mr. Higgins stated at one of the earlier meetings it was
requested to have a narrative submitted of how the applicant plans to
operate the new buildings and asked if that has been done. Mr. Andress
stated he has not seen that information, but Mr. Joe Bianchine was the
previous presenter. Mrs. Patenaude asked if the Board has received a
copy of the traffic study. Mr. Andress stated it has not been
submitted. Mrs. Patenaude stated he and Mr. Ruchlicki went to this
site and she was very impressed with this business as a whole. The
place was clean, well run and no smells. Mrs. Patenaude stated there
were some issues that Mr. Ruchlicki will discuss. Mr. Ruchlicki stated
when they were on the site there was an area behind the bins there was
some fill in there from a demolition job and they are using it as
fill. Mr. Ruchlicki stated they did speak to Mr. Earl about it and
stated that area should be cleaned up and covered with dirt and
seeded. Mr. Ruchlicki stated it is close to the creek and the
wetlands. Mr. Ruchlicki stated he would like to see more work done by
the location of the new well. Mr. Ruchlicki stated he would like CHA
to get together with the applicant to review the retention basin. Mr.
Ruchlicki would like to see the specifications for the oil and water
separators. Mrs. Patenaude stated one other thing was underneath the
new building they talked about liners that would go down to protect
any seepage and wanted to know if any of that was on the plans. Mr.
Andress asked if Mrs. Patenaude meant the liners under the concrete.
Mrs. Patenaude stated she believes it was underneath the area
surrounding it. Mr. Ruchlicki stated there is something permeable
under the current sorting slabs. Mr. Andress stated under a slab they
would do that but not under a building. Mrs. Patenaude would like some
detail on that. Mr. Watts stated they would schedule a public
informational meeting.
Mrs. Patenaude made a motion to schedule a public informational
meeting for Monday August 25, 2003 at 7: 00 pm or as soon there after.
Mr. Higgins seconded. Motion carried.
03.167 Kinetic Towing, 159 Ushers Road, Change of Tenant. Mr. Joe
Tedesco was present and stated he was previously before the Board for
a change of tenant and he needed a variance. Mr. Tedesco stated he has
been to the Zoning Board and has been granted approval. Mr. Tedesco
stated they are not at this time adding the living space they are only
looking for the approval of the change of tenant. Mr. Tedesco stated
they are still using 21 Solar Drive during the day. Mr. Watts asked if
anyone had any questions.
Mr. Berkowitz made a motion to approve the change of tenant as
presented. Mr. Nadeau seconded. Motion carried.
03.173 Ellsworth/Babcock Subdivision, 306A Grooms Road, Lot Line
Adjustment.
03.174 Babcock Financial Advisors, Inc., 306A Grooms Road, Change of
Tenant & Sign. Mr. Duane Rabideau of Gil Van Guilders Office was
present and stated they are looking for approval of the lot line
adjustment and change of tenant. Mr. Rabideau stated they are making a
single-family home into professional offices. Mr. Rabideau stated some
of the issues that came up were is there enough site distance on
Grooms Road. Mr. Rabideau stated looking to the east there is
approximately 547 feet and looking to the west there is approximately
929 feet. Mr. Rabideau stated one other issue that came up was the
drainage around the house. Mr. Rabideau stated he spoke to Mr. Tom
Babcock about the potential dumpster and stated his use does not
warrant a dumpster. Mr. Rabideau stated they have provided a location
for a dumpster for the future if one is needed. Mr. Watts asked why
would they do that. Mr. Rabideau stated it was requested by CHA. Mr.
Watts stated he does not understand that and to not even put the pad
there. Mr. Rabideau stated ok. Mr. Rabideau stated one other issue was
with the sign. Mr. Rabideau stated the sign is now parallel with
Grooms Road. Mr. Nadeau asked Mr. Bianchino if he reviewed the
drainage. Mr. Bianchino was reviewing it now. Mr. Watts asked if there
was any intention of touching any of the trees by the Timberwick side.
Mr. Rabideau responded no the only changes would be to add trees to
the front of the site. Mr. Higgins asked if they should put their snow
storage on the western side. Mr. Bianchino agreed. Mr. Higgins stated
on another professional office site they had mentioned difficulty
about seeing a sign that is parallel to the road instead of
perpendicular. Mr. Higgins asked if they wanted to look at that
further. Mr. Watts stated based on the ordinance the size of the sign
would be to small so they would need to make it that way. Mr. Williams
stated at the last meeting Mr. Roberts looked at it and they are only
allowed 10 square feet. Mr. Roberts is ok with the sign. Mr. Bianchino
asked if they were granted approval by the ZBA. Mr. Rabideau stated
yes. Mr. Bianchino stated the question of parking in the front of a
POR was not addressed. Mr. Bianchino stated the ordinance indicates
parking should be in the rear or on the side. Mr. Nadeau stated from
Grooms Road you couldn’t see the cars. Mrs. Patenaude stated with the
location of the house in the front actually gives some protection to
the parking lot.
Mr. Nadeau made a motion to approve the application as presented
contingent upon the 50-foot buffer being maintained and CHA’s sign off
on the drainage. Mrs. Patenaude seconded. Motion carried.
03.180 Car Essentials Inc., 1603 Route 9, Sign. This application was
removed from the agenda.
New Business:
03.187 Team Title Abstractors Inc., 1406 Route 9, Change of Tenant &
Sign. No one was present.
03.188 Your Salon Gallery, 1581 Route 9, Sign. Mr. Frank Stauder was
present and stated there is a change in the name of the business. It
is Salon Gallery not Your Salon Gallery. The Attorney misrepresented
it at the time of the first application. Mr. Stauder stated the sign
would be 36 square feet internally lit. Mr. Watts asked Mr. Williams
if there were any problems with it. Mr. Williams responded no. Mr.
Watts asked if Mr. Roberts has seen this. Mr. Williams stated he did
not have the opportunity to see it. Mr. Stauder stated it would be
replacing the I Love My Heart sign.
Mr. Berkowitz made a motion to approve the sign application as
presented. Mr. Higgins seconded. Motion carried.
03.189 1-800-Mattres, 1581 Route 9, Change of Tenant & Sign.
03.190 I love My Heart, 1581 Route 9, Change of Tenant & Sign. Mr. Tom
Andress presented both applications together. Mr. Andress stated I
Love My Heart is moving from upstairs to downstairs. The Salon was
approved at the last meeting and they are taking a portion of the I
Love My Heart space. 1-800-Mattres is going to occupy the other half
of the I Love My Heart space. Mr. Nadeau asked what was approved for
downstairs other then storage. Mr. Andress stated there is an 8,000
square foot building footprint for the two stories which adds up to
16,000 square feet total building. The top story has been approved for
8,000 square feet of Office/Retail and the bottom story has been
approved for 2,800 square feet of Office/Retail totaling 10,800 square
feet leaving 5,200 square feet for storage in the basement. I Love My
Heart will utilize the bottom retail area of 2,400 square feet and the
rest will be utilized for storage from all of the tenants. The
Planning Board originally 21st Century Mechanical to utilize the
bottom area. Mr. Higgins stated it was not for retail but for storage.
Mr. Andress responded the site plan approval allowed 2,800 retail use
for the bottom area. Mr. Higgins agreed but asked how the storage area
is separated from the retail area. Mr. Andress stated by a wall and is
accessible from all of the tenants. Mr. Nadeau asked where will the
customers park to access I Love My Heart. Mr. Andress stated there is
parking set up from the original site plan in the back of the
building. Mr. Higgins stated that there are only three lights for the
whole site and questioned if the top coat has been placed. Mr. Andress
stated he believes so and that it his understanding the owner is
preparing to place sealer on the parking lot. Mr. Higgins stated that
there is one light in the back and if that was safe for customers to
utilize the area. Mr. Watts asked if Mr. Williams could check the
status of the lighting and the pavement compared to the site plan.
Mrs. Patenaude made a motion to approve the new tenant application and
the I Love My Heart change in location contingent on the Planning
Department reviewing the site to assure there is sufficient lighting
in the rear of the building and the top course and pavement is in good
condition. Mr. Nadeau seconded. Motion carried.
Mr. Watts asked if anyone had anything else for the Board. Mrs.
Patenaude made a motion to adjourn at 9:35 pm. Mr. Nadeau seconded.
Motion carried.
The next Planning Board meeting will be August 25, 2003.
Respectfully Submitted
Tara Anuszewski, Secretary
Town of Halfmoon Planning Board
|